CASE STUDY 1

  • Issues with property before acquisition

    • Awkward floor plans due to conversion to a duplex
    • Outdated everything- paneling, electric, water heaters,bathrooms, kitchens, etc.
    • Had been unoccupied for 6 years

    Value adds implemented after acquisition

    • Complete remodel of both apartments, every room!
    • Floor plans were adjusted to suit best flow (ie, switching the kitchen and bedroom downstairs)
    • Gas lines were separated and updated
    • Common area laundry was added
    • Rock driveway to add parking space

CASE STUDY 2

CASE STUDY 2

Issues with property before acquisition

  • Shared bathroom between units upstairs. New bathroom needed to be added
  • Outdated everything- paneling, electric, water heaters, heating system (gas to electric), bathrooms, kitchens, etc.
  • Had been unoccupied for over 15 years
  • Fire separation to be added all throughout the units

Value adds implemented after acquisition

  • Complete remodel of all apartments, every room!
  • Bathroom was added into one upstairs unit
  • All electric, plumbing, and heating were updated
  • Rock driveway to add parking space

CASE STUDY 3

  • Issues with property before acquisition

    • Foundation needed emergency repair before collapsing
    • Porch was a hazard to the public. Siding was exposed.
    • It had no gutters and facia needed serious repair
    • Tons of garbage filled the basement and garage

    Value adds implemented after acquisition

    • Porch was removed, a new one was built along with a portico. The exposed siding was replaced with new vinyl
    • Foundation repair. Fixed a 7-inch gradient to 3 inches
    • Barn door, shutters, and flower beds added for curb appeal
    • All garbage was removed (2 dumpsters and 9 truck loads)
    • Retaining wall was replaced with proper irrigation system
    • Gutters added all around the house
    • Brand new kitchen

CASE STUDY 4

  • Issues with property before acquisition

    • Filled with trash from previous tenants
    • Roof needing repair
    • All plumbing and electric were stripped from trespassers
    • All plumbing needing replaced

    Value adds implemented to date

    • Emptied all trash
    • Installed fire-rated walls per engineer direction
    • New kitchen and bathrooms installed
    • Removed all overgrown bushes and landscaped
    • All new electric and plumbing being installed
    • All walls being painted